![](images/home.jpg)
當前位置:
首頁 > 信息發布>>精品工程
北京西北熱電中心京能燃氣熱電工程
創建日期2017-09-25瀏覽日期2024-05-27瀏覽次數4328
本好項目最(zui)靠近(jin)深圳市石景深山區廣(guang)寧(ning)路10號,建(jian)筑范圍為(wei)3×400MW級(F級)然氣供(gong)暖機(ji)柜.本市政工(gong)程于2010年(nian)011月復(fu)工(gong),2015年(nian)八月“二拖一(yi)”機(ji)柜一(yi)一(yi)整(zheng)套(tao)開(kai)機(ji)開(kai)機(ji)168個時(shi)間(jian)試(shi)運(yun)成(cheng)(cheng)功(gong)搞定,2015年(nian)11月“一(yi)拖一(yi)”機(ji)柜一(yi)一(yi)整(zheng)套(tao)開(kai)機(ji)開(kai)機(ji)168個時(shi)間(jian)試(shi)運(yun)成(cheng)(cheng)功(gong)搞定,獲“201六年(nian)度亞洲地區多(duo)元化(hua)電量技術(shu)工(gong)藝(yi)大獎(jiang)”,突出(chu)貢獻獎(jiang)“2016-201六年(nian)度中國(guo)現代較佳創(chuang)業非常獎(jiang)”。
![](//125seo.com/scripts/ueditor/net/upload1//blob6346899.png)
The project is located in Guangning 10th Road, Shijingshan District,Beijing, consists of 3 × 400MW class (F) gas heating unit (3×300 MW gas turbine+300MW steam turbine+135MW steam turbine), started on September, the first unit put into operation in August 2014, the second unit put into operation in August 2014, was awarded "2016 Asia Innovative Power Technology Gold Award", and "2016-2017 Chinese Best Investment Special Award."
![](//125seo.com/scripts/ueditor/net/upload1//blob2210991.png)